"Production had been on a steady 19% per year decline... The [Titan] treatment immediately arrested the field's decline..."
— Bill Davis, Rankin Field Report, Petroleum Engineer, Vector Minerals Corp.
Significant increase in production and cash flow
Low cost
Low risk: A simple pilot test is implemented on 2-3 wells
No capital expense
Increased recovery
Life of field is extended for years
Reduced lifting costs
Costly oil field shutdown expenses for mature fields are postponed
Environmentally friendly (hydrogen sulfide decreases; no harsh chemicals or additives used)
Oil production increases within 2 weeks to 2 months depending on the size of the field
During the Titan Process, producing wells are not shut in
The Titan Process will work on a majority
of waterflood fields
Reserviors using waterfloods, CO2 flooding and other tertiary enhanced recovery methods may qualify depending on several variables. Fields still under primary production water drives also may be enhanced by the Titan Process.
We will do a complimentary analysis of your field if you will fill out the following form. There is no cost for this simple review of your field.
Titan Oil Recovery, Inc. All Rights Reserved. TITAN OIL RECOVERY, the sunset/oil pump logo and THE TITAN PROCESS are trademarks owned by Titan Oil Recovery, Inc. All other trademarks are the property of their respective owners. Site design and maintenance by Design Strategies, Inc.